A.S.Global

A.S.Global Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from A.S.Global, Épicerie, .

05/01/2026
22/09/2025
Beautiful design, throw your flowers 💐
02/09/2025

Beautiful design, throw your flowers 💐

Concrete Finishing
02/09/2025

Concrete Finishing

I'm a structural Engineer.We design, Build/Construct, Rehabilitate and work as a consultant.
02/09/2025

I'm a structural Engineer.
We design, Build/Construct, Rehabilitate and work as a consultant.

Foundation and base frame installation of a light-frame building
01/09/2025

Foundation and base frame installation of a light-frame building

FOUNDATION PROCEDURE: HOW TO START YOUR BUILDING THE RIGHT WAY The foundation is the strength of every building. If it i...
01/09/2025

FOUNDATION PROCEDURE: HOW TO START YOUR BUILDING THE RIGHT WAY

The foundation is the strength of every building. If it is weak, the entire house will suffer no matter how beautiful it looks above. Many houses collapse today not because of roofing or finishing, but because the foundation was not properly done.

Here is a detailed step-by-step guide to a standard foundation:

1. Site Clearing

Before anything, the land must be cleared. Remove bushes, grasses, trees, stumps, and topsoil. This ensures you have a level and stable surface to work with. A clean site makes measurement and supervision easier.

2. Setting Out

This is the stage where the exact positions of your building walls are marked on the ground. Professionals use pegs, profile boards, strings, and sometimes theodolites for accuracy. A small mistake here can shift your building or even cause you to encroach on another person’s land. Always involve a trained engineer or builder at this stage.

3. Excavation

After marking out, trenches are dug according to the width and depth specified in the drawing. The depth depends on the soil type and load of the building. Weak soils need deeper foundations. Never guess—use the soil report and engineer’s design.

4. Foundation Concrete (Blinding)

A thin layer of concrete (usually 50–75mm thick) is placed at the base of the trenches. This is called “blinding.” It provides a clean, stable surface for blockwork and prevents soil moisture from weakening the blocks.

5. Blockwork to DPC Level

Blocks are laid inside the trench and raised up to the Damp Proof Course (DPC) level. This stage determines the height of your house from the ground. A good DPC prevents water from rising into the walls (which causes dampness and peeling paint later).

6. Backfilling & Compaction

After blockwork, the open spaces in the trench are filled with laterite or sand. This filling must be done layer by layer and compacted properly. If it is not well compacted, the floor may sink or crack in future.

7. Oversite Concrete (German Floor)

Finally, a thick layer of concrete (often 100–150mm) is poured over the filled area to form a solid base for the building floor. This stage is also where plumbing pipes and electrical conduits can be embedded before concreting.

👉 Conclusion:
The foundation is not where you should rush or cut costs. A small error here can cause big problems later. Build strong, build smart, and your house will stand firm for generations.

Perfect work @ A.S Global Enterprise and construction Ltd.
20/08/2025

Perfect work @ A.S Global Enterprise and construction Ltd.

Address


Website

Alerts

Be the first to know and let us send you an email when A.S.Global posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

  • Want your business to be the top-listed Grocery Store?

Share